State Crest
New South Wales Industrial Relations Commission
(Industrial Gazette)





spacer image spacer image

Transport Industry - General Carriers Contract Determination
  
Date01/30/2015
Volume377
Part1
Page No.163
DescriptionVCD - Variation of Contract Determination
Publication No.C8272
CategoryContract Determination
Award Code 105  
Date Posted01/30/2015

spacer image spacer image

spacer image Click to download*
spacer image

(105)

SERIAL C8272

 

Transport Industry - General Carriers Contract Determination

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Transport Workers' Union of New South Wales, Industrial Organisation of Employees.

 

(No. IRC 529 of 2014)

 

Before Commissioner Tabbaa

17 November 2014

 

VARIATION

 

1.         Delete Table One and Table Two of Schedule 1 of the Contract Determination published 19 December 1984 (235 I.G. 1611), and insert in lieu thereof the following:

 

Table One - Vehicle Rates

 

(Where the Commonwealth Government’s fuel tax credit subsidy (‘the subsidy) is applicable)

 

Class of Vehicle

Vehicle Age

 

Scale A  (Up to 1 year)

Scale B (over 1 year, up

Scale C (over 3 yrs)

 

 

to 3 yrs)

 

Rigid Vehicles

Hourly

Running

Hourly

Running

Hourly

Running

 

Standing

Rate

Standing

Rate

Standing

Rate

 

Rate

(cents per

Rate

(cents per

Rate

(cents per

 

($ per

km)

($)

km)

($)

km)

Carrying Capacity

hour)

 

 

 

 

 

 

 

 

 

 

 

 

Up to 2 Tonnes

 

 

 

 

 

 

2 TO 5 Tonnes

36.81

43.29

32.32

46.43

25.93

46.49

5 TO 8 Tonnes

43.53

59.91

37.01

60.18

27.84

60.22

8 TO 10 Tonnes

50.88

73.25

42.19

74.09

35.69

74.12

10 TO 12 Tonnes

68.02

103.12

53.39

101.97

43.38

102.10

12 TO 14 Tonnes

88.21

129.63

66.70

129.58

52.33

129.73

14 Tonnes +

98.33

153.84

73.54

152.48

56.12

152.66

Single Axle Prime Mover

71.24

139.95

55.78

140.59

45.52

140.71

Bogie Axle Prime Mover

101.04

161.07

75.50

160.95

57.51

161.12

 

Table Two - Vehicle Rates

 

(Where the Commonwealth Government’s fuel tax credit subsidy (‘the subsidy) does not apply)

 

Class of Vehicle

Vehicle Age

 

Scale A (Up to 1 year)

Scale B (over 1 year, up

Scale C (over 3 yrs)

 

 

to 3 yrs)

 

Rigid Vehicles

Hourly

Running

Hourly

Running

Hourly

Running

Carrying Capacity

Standing

Rate

Standing

Rate

Standing

Rate

 

Rate

(cents per

Rate

(cents per

Rate

(cents per

 

 ($)

km)

 ($)

km)

 ($)

km)

Up to 2 Tonnes

32.54

42.56

28.10

43.09

 

 

2 to 5 Tonnes

36.81

49.00

32.28

49.08

25.93

49.14

5 to 8 Tonnes

43.53

63.08

36.96

63.53

27.84

60.21

8 to 10 Tonnes

50.88

76.64

42.12

77.97

35.69

74.25

10 to 12 Tonnes

68.02

108.71

53.32

106.61

43.38

102.56

12 to 14 Tonnes

88.21

136.28

66.60

136.50

52.33

129.78

14 Tonnes +

98.33

162.38

73.43

160.21

56.12

152.96

Single Axle Prime Mover

71.25

147.36

55.71

148.36

45.52

140.72

Bogie Axle Prime Mover

101.04

169.54

75.40

169.36

57.51

161.32

 

2.         Delete 12(d) of Schedule 2 and insert in lieu thereof the following:

 

(d)        The fuel index, reflecting the rate as at 21 September 2014, is 154.8 cents per litre. This index is exclusive of GST.

 

3.         Delete Schedule 3 and insert in lieu thereof the following:

 

SCHEDULE 3

 

Additional Amounts

 

1.         Trailer Allowance

 

A Contract Carrier who, in order to perform a contract of carriage, is required to supply a flat top trailer for use in a contract of carriage shall be paid the following allowances for each day (and proportionately for part of a day) during which the equipment is used for the purpose of the contract of carriage:

 

Single Axle

$19.75 per day

Dual Axle

$25.89 per day

Tri Axle

$31.85 per day

 

2.         Ropes and Gear Allowance

 

A Contract Carrier who, in order to perform a contract of carriage, is required to supply tarpaulins, ropes, gates, chains  and  dogs  for  use  in a  contract  of  carriage  shall  be  paid  the  following allowance  for  each  day (and proportionately for part of a day) during which the equipment is used for the purpose of the contract of carriage:

 

$4.01 per day.

 

3.         Twistlock Allowance

 

A Contract Carrier who, in order to perform a contract of carriage, is required to fit his trailer with twistlocks for the carriage of I.S.O. containers shall be paid the following allowance for each day (and proportionately foe part of a day) during which the equipment is used for the purpose of the contract of carriage:

 

$3.01 per day.

 

4.         Mechanical Lifting Equipment Allowance

 

A Contract Carrier who, in order to perform a contract of carriage, is required to supply rear or side-loading mechanical devices, shall be paid the following allowance for each day (and proportionately for part of a day) during which the equipment is used for the purpose of the contract of carriage:

 

Rear-Lift Platforms:

 

Up to and including 3,000 lbs. capacity: $4.80 per day

 

Up to and including 6,000 lbs. capacity: $6.57 per day.

 

Side-Loading Devices:

 

$21.18 per day

 

4.         Delete the table appearing in 2(c) of Schedule 4 and insert in lieu thereof the following:

 

Class of Vehicle

Rate A

Rate B

Rigid Vehicle

Subsidy

No Subsidy

Not less than 8 and not greater than 10 tonnes

47.27

47.87

Not less than 10 and not greater than 12 tonnes

57.61

58.33

Not less than 12 and not greater than 14 tonnes

69.11

70.15

Not less than 14 tonnes

76.18

77.39

Single Axle Prime Mover

65.26

66.45

Bogie Axle Prime Mover

78.45

79.77

 

5.         Delete the table appearing in 3, Trailer Allowance of Schedule 4 and insert in lieu thereof the following:

 

40 ft Skel trailer

$52.20 per day

40 ft General Purpose trailer

$52.20 per day

Dog or Pig trailer

$39.07 per day

Pup trailer

$26.10 per day

20 ft Skel trailer

$46.99 per day

 

6.         Delete the table appearing in 4, Towing rates of Schedule 4 and insert in lieu thereof the following:

 

40 ft trailer

$2.73 per hour

Dog/Pig trailer

$5.35 per hour

Pup trailer

$3.94 per hour

 

7.         This variation shall take effect from the first full pay period to commence on or after 15 December 2014.

 

 

 

 

I. TABBAA, Commissioner

 

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'