BEFORE THE INDUSTRIAL RELATIONS COMMISSION
BUILDING EMPLOYEES MIXED INDUSTRIES (STATE) AWARD
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Application by Construction,
Forestry, Mining and Energy Union (New South Wales Branch) , industrial
organisation of employees.
(No. IRC 3267 of 2005)
Before The Honourable
Justice Kavanagh
|
7 July 2005
|
VARIATION
1. Delete
subclause 16.8 of clause 16, Wages, of the award published 16 November 2001
(329 I.G. 577), and insert in lieu thereof the following:
16.8 The rates of
pay in this award include adjustments payable under the State Wage Case 2005.
These adjustments may be offset against:
(i) any
equivalent overaward payments, and/or
(ii) award wage
increases since May 1991 other than safety net, State Wage Case and minimum
rates adjustments.
2. Delete Part
B, Monetary Rates, and insert in lieu thereof the following:
PART B
MONETARY RATES
Table 1 - Wages
|
Base Rate
|
Supplementary
|
SWC
|
Tool
|
Ordinary
|
|
|
payment
|
Adjustments
|
Allowance
|
Weekly Rate
|
|
$
|
$
|
$
|
$
|
$
|
Carpenters &
|
367.30
|
38.20
|
153.00
|
22.70
|
581.20
|
Joiners
|
|
|
|
|
|
Bricklayers
|
367.30
|
38.20
|
151.00
|
16.00
|
572.50
|
Plumbers
|
369.60
|
38.00
|
153.00
|
22.70
|
n/a
|
including:
|
|
|
|
|
|
Gasfitters &
|
|
|
|
|
|
Drainers
|
|
|
|
|
|
Painters,
|
367.30
|
38.00
|
153.00
|
5.50
|
n/a
|
Including:
|
|
|
|
|
|
Signwriters
|
|
|
|
|
|
Marblers,
|
|
|
|
|
|
Grainers &
|
|
|
|
|
|
Artworkers
|
|
|
|
|
|
Builders Labourer
Classification
|
Previous Ordinary
|
SWC Adjustments
|
Current Ordinary
|
|
Weekly Rate
|
|
Weekly Rate
|
|
$
|
$
|
$
|
1.
|
Rigger, Dogger
|
431.40
|
84.00
|
515.40
|
2.
|
Scaffolder (as defined), powder
monkey
|
420.20
|
84.00
|
504.20
|
hoist or winch driver,
foundation shaftperson
|
|
|
|
(as defined), concrete finisher
(as defined), steel
|
|
|
|
fixer including tack welder
|
|
|
|
3.
|
Bricklayer’s labourer,
plasterer’s labourer,
|
408.00
|
84.00
|
492.00
|
assistant rigger (as defined),
assistant powder
|
|
|
|
monkey (as defined) demolition
work (after 3
|
|
|
|
months experience) gear hand,
pile driver
|
|
|
|
(concrete), hammerperson, mixer
driver (concrete),
|
|
|
|
steel erector, aluminium alloy
structural erectors,
|
|
|
|
(whether pre-fabricated or
otherwise), gantry hand
|
|
|
|
or crane hand, crane chaser,
cement gun operator,
|
|
|
|
concrete cutting or drilling
machine operator,
|
|
|
|
concrete gang including
concrete floater
|
|
|
|
(as defined), roof layer
(malthoid or similar
|
|
|
|
material) dump cart operator,
under pinner, steel or
|
|
|
|
bar bender to pattern or plan,
concrete formwork
|
|
|
|
stripper
|
|
|
|
4.
|
Builder’s labourer employed on
work other
|
384.20
|
84.00
|
468.20
|
than that specified in (1) to
(3) hereof
|
|
|
|
Apprentices
Carpenters/Joiners/Bricklayers/Painters
|
Indentured
|
Trainees
|
|
$
|
$
|
1st Year
|
193.00
|
216.40
|
2nd Year
|
282.20
|
316.70
|
3rd Year
|
373.70
|
410.60
|
4th Year
|
436.90
|
461.20
|
Plumbers
|
$
|
$
|
1st Year
|
194.80
|
220.00
|
2nd Year
|
284.70
|
320.00
|
3rd Year
|
375.00
|
413.90
|
4th Year
|
441.10
|
465.70
|
Table 2 -
Allowances
Item
|
Clause
|
Description
|
Amount
|
|
|
|
$
|
1
|
16.1
|
Tool Allowance
|
22.70
per week
|
|
16.1
|
Carpenter/Joiner
|
16.00
per week
|
|
16.2
|
Bricklayer
|
22.70
per week
|
2
|
16.3
|
Plumber
|
5.50
per week
|
|
16.4
|
Painter
|
0.50
per hour
|
|
|
Plumber - Registration
Allowance
|
|
|
|
Adjustments
|
|
|
16.2.2
|
Ships Plumber
|
0.25
per hour
|
|
16.2.3
|
Drainer (amount to be deducted)
|
0.05
per hour
|
|
16.3.2
|
Signwriter
|
0.39
per hour
|
|
16.3.3
|
Marbler and Grainer
|
0.39
per hour
|
|
16.3.4
|
Ship Painter
|
0.32
per hour
|
|
16.3.5
|
Casual Ships Painter
|
12.43
per day
|
|
16.3.6
|
Signwriter, Grainer, Gilder on
Ship work
|
0.68
per hour
|
|
16.3.7(a)
|
Artworker Grade 2
|
0.38
per hour
|
|
16.3.7(b)
|
Artworker Grade 1
|
0.70
per hour
|
All
Employees
|
3
|
17.2.1
|
Insulation
|
0.61
per hour
|
4
|
17.2.2
|
Hot Work
|
|
|
|
between 46 and 54 degrees
|
0.49
per hour
|
|
|
exceeding 54 degrees
|
0.61
per hour
|
5
|
17.2.3
|
Cold Work
|
0.49
per hour
|
6
|
17.2.4
|
Confined Spaces
|
0.61
per hour
|
7
|
17.2.5
|
Swing Scaffold
|
|
|
|
first four hours
|
3.55
|
|
|
every hour after
|
0.69
per hour
|
8
|
17.2.6
|
Wet Work
|
0.49
per hour
|
9
|
17.2.7
|
Dirty Work
|
0.49
per hour
|
10
|
17.2.8
|
Towers Allowance
|
|
|
|
above 15 meters in height
|
0.49
per hour
|
|
|
each additional 15 meters
|
0.49
per hour
|
11
|
17.2.9
|
Toxic Substances
|
|
|
|
preparation and application
|
0.61
per hour
|
|
|
when air conditioning plant not
operating
|
0.39
per hour
|
|
|
Close Proximity to employees so
engaged
|
0.49
per hour
|
12
|
17.2.11
|
Computing Quantities
|
|
|
|
All Trades except Plumbers
|
3.55
per day
|
|
|
Plumbers
|
0.49
per hour
|
13
|
17.2.12
|
Asbestos Eradication
|
1.64
per hour
|
Carpenters,
Joiners and Bricklayers Only
|
14
|
17.3.1
|
Roof Work
|
0.61
per hour
|
15
|
17.3.2
|
Ship Repair
|
11.92
per week
|
16
|
17.3.3
|
Second Hand Timber
|
1.93
per day
|
17
|
17.3.4
|
Acid Work
|
1.30
per hour
|
18
|
17.3.5
|
Cleaning Down Brick Work
|
0.44
per hour
|
19
|
17.3.6
|
Bagging
|
0.44
per hour
|
20
|
17.3.7
|
Brick Cutting Machine
|
0.61
per hour
|
21
|
17.3.8
|
Heavy Blocks
|
|
|
|
weighting over 5.5 kg and under
9 kg
|
0.49
per hour
|
|
|
weighting over 9 kg and under
18 kg
|
0.89
per hour
|
|
|
weighting over 18 kg
|
1.25
per hour
|
Carpenters,
Joiners, Bricklayers and Painters
|
22
|
17.4.1
|
Tunnel and Shaft
|
0.61
per hour
|
23
|
17.4.2
|
Furnace Work
|
1.30
per hour
|
24
|
17.4.3
|
Explosive Power Tools
|
1.16
per hour
|
Plumbers
Only
|
25
|
17.5.1
|
Chokages
|
5.59 per day
|
26
|
17.5.2
|
WC's Urinals
|
0.61 per hour
|
27
|
17.5.3
|
Height Work
|
0.49 per hour
|
28
|
17.5.4
|
Lead Burner
|
0.62 per hour
|
|
|
Lead Burner in Chemical Works
|
0.82 per hour
|
|
|
Oxyacetelyne or Electric
Welding Certificate
|
0.44 per hour
|
|
|
Welding in Compliance with
AS4041-1998
|
0.64 per hour
|
|
|
|
Min per day $ 4.97
|
|
|
Welding other then under
17.5.4(c)
|
0.12 per hour
|
29
|
17.5.5
|
Using or in close proximity to
Asbestos
|
0.61 per hour
|
30
|
17.5.6
|
Slaughter Yards
|
1.16 per hour
|
31
|
17.5.7
|
Roof Work
|
0.68 per hour
|
32
|
17.5.8
|
Use of Licences
|
|
|
|
Plumber’s Licence
|
0.75 per hour
|
|
|
Gasfitter’s Licence
|
0.75 per hour
|
|
|
Drainer’s Licence
|
0.65 per hour
|
|
|
Plumber’s and Drainer’s Licence
|
1.01 per hour
|
|
|
Plumber’s and Gasfitter’s
Licence
|
1.01 per hour
|
|
|
Gasfitter and Drainers Licence
|
1.40 per hour
|
33
|
17.5.9
|
District Allowance
|
|
|
(a)
|
|
0.80 per hour
|
|
(b)
|
|
1.30 per hour
|
|
(c)
|
|
1.30 per hour
|
Ship
Plumbers
|
34
|
17.6.1
|
Ballast and Oil Tanks
|
0.61 per hour
|
34
|
17.6.2
|
Bilges
|
0.44 per hour
|
38
|
17.6.3
|
Diesel Engines
|
0.44 per hour
|
Painters
|
37
|
17.7.2
|
Height Work
|
0.44 per hour
|
38
|
17.7.3
|
Use of Rigging or Scaffold
Certificate
|
0.49 per hour
|
39
|
17.7.4
|
Spray Allowance
|
0.49 per hour
|
40
|
17.7.5
|
Power Tools
|
0.49 per hour
|
Builders
Labourers
|
41
|
16.4.2
|
Builders Labourer engaged on
maintenance
|
12.91 per week
|
|
16.4.3
|
Builders Labourer other than on
maintenance
|
8.65 per week
|
42
|
17.8.1
|
Work on Acid Resistant Brick
Work
|
0.46 per hour
|
|
17.8.2
|
Boilers, furnaces, Kilns, etc
|
0.46 per hour
|
43
|
17.9.1
|
Apprentices use of Rigging or
Scaffold Certificate
|
0.49 per hour
|
44
|
18
|
Leading Hand
|
Per week
|
|
|
Carpenters and Bricklayers
|
|
|
|
In charge of:
|
|
|
|
not more than 1 person
|
13.90 per week
|
|
|
more than 2 but not more than 5
persons
|
30.60 per week
|
|
|
more than 5 but not more than
10 persons
|
39.00 per week
|
|
|
more than 10 persons
|
52.00 per week
|
|
|
|
|
|
|
Plumbers
|
|
|
|
In charge of:
|
|
|
|
up to 2 journeypersons
|
0.66 per hour
|
|
|
3 to 5 journey persons
|
0.79 per hour
|
|
|
5 to 10 journeypersons
|
1.01 per hour
|
|
|
over 10 journeypersons
|
1.30 per hour
|
|
|
|
|
|
|
Painters
|
|
|
|
In charge of:
|
|
|
|
1 to 5 journeypersons (and/or
apprentices)
|
6.13 per day
|
|
|
6 to 15 journeypersons (and/or
apprentices)
|
7.65 per day
|
|
|
more than 15 journeypersons
(and/or apprentices)
|
10.46 per day
|
|
|
|
|
|
|
Builders’ Labourers
|
|
|
|
In charge of
|
|
|
|
not less than 2 nor more than 5
persons
|
25.30 per week
|
|
|
not less than 5 nor more than
10 persons
|
31.70 per week
|
|
|
more than 10 persons
|
42.80 per week
|
45
|
20.3.2
|
Ships Work - Special Places
|
0.44 per hour
|
46
|
20.3.3
|
Insulations with granulated
cork
|
0.44 per hour
|
47
|
20.4
|
Removal Bitumous Compounds
|
0.44 per hour
|
48
|
|
Industry Allowance
|
21.70
|
49
|
15.2
|
Overtime Meal Allowance
|
10.20 per meal
|
50
|
22.3.1(b)
|
Living Away from Home - Weekly
|
348.10 per week
|
51
|
22.3.1(c)
|
Living Away from Home - Daily
|
49.80 per day
|
52
|
22.4.1(a)(iii)
|
Travel Expenses - Meal
|
10.20 per meal
|
|
22.4.1(b)(i)
|
Return Journey
|
16.60 per occasion
|
54
|
22.6.5
|
Weekend Return Home
|
28.00 per occasion
|
55
|
24.1.1
|
First Aid Allowance
|
2.03 per day
|
56
|
26.2.1
|
Loss of Tools and Clothing
|
1315.00
|
3. This variation
shall take effect from the beginning of the first pay period to commence on or
after 10 July 2005.
T. M. KAVANAGH J.
____________________
Printed by
the authority of the Industrial Registrar.
|